Project includes renovation and new construction incorporated into an existing facility that is to remain in operation during construction.
Expand and Enhance the Space
The project utilized construction sequencing information to facilitate on-going function and minimize user disruption. The existing 68,000 s.f. facility is expanding to approximately 126,000 s.f. New construction includes a running track, indoor weight and aerobic areas, and new locker rooms and sauna areas. Also incorporated are energy saving systems such as sun-efficient glazing and an off-peak energy storage system to reduce cooling loads.